Surveying and Contracting in Giza, 6th of October and Sheikh Zayed
Giza stretches from farmland along the Nile to the desert edge at 6th of October and Sheikh Zayed. Desert land and industrial zones usually need special care with levels and cut-and-fill quantities before design and construction.
What we most often do here
- Topographic surveys of desert land and new projects
- Levelling and cut-and-fill before grading
- Setting out factories and residential buildings
- Quantity take-off and work review
Technical note
Most of Giza lies in UTM zone 36N. Where levels change clearly across a site, we set the observation spacing by slope so important changes are not lost between points.
How we work on projects outside Alexandria
- You send the location, the type of work and any drawings or documents you have.
- We define the scope, deliverables and number of site visits before travelling.
- The written quote covers site work, office work and travel arrangements.
- We deliver the files digitally and go through them with you after delivery.
Services available in Giza and 6th of October
- Certified land survey: A certified survey measures a plot or building on site and produces a drawing of its boundaries, lengths, area and coordinates, in a form accepted by the body you will submit it to: the real-estate registry, the district office, the permit authority, or a court in a boundary dispute.
- Topographic surveying: A topographic survey turns a site into a map of the ground shape, its levels and everything visible on it, such as roads, buildings and utilities.
- Setting out: A small setting-out error can put a column in the wrong place and lead to demolition and rework.
- Grid levelling: Grid levelling measures ground levels on a regular grid, showing where the land is high or low and how much cut or fill is needed to reach the design level.
- Quantity surveying: A quantity take-off answers a simple question: what will be built, and how much of it? A clear table helps owners compare bids, helps contractors price and track work, and bases payment reviews on measurement instead of estimates..
- As-built surveys: Many existing buildings have no drawings, or drawings that differ from what was built.
- Land and boundary surveys: Before buying, dividing or building on land, you need to know its corners and real area on the ground.
FAQ
Do you work in the 6th of October industrial zones?
We can assess the project and define what is needed, whether a survey, setting out or quantity take-off. Send the location and available drawings.
Do I need a topographic survey before building a factory?
Usually yes, because levels affect foundations, drainage, internal roads and earthwork quantities.
Tools to help before you call
- GPS ↔ UTM Coordinate Converter
- Land Area Calculator from Coordinates
- Area Unit Converter (Feddan, Qirat, Sahm, m²)
- Finishing Quantities Calculator (Paint, Tiles, Skirting)
- Slope Calculator (Percent, 1:n, Degrees)
- Distance and Bearing Between Two Points
- Level Book Reduction Calculator
- Cut and Fill Calculator from a Level Grid