Setting Out Power Line Foundations
Review coordinates, axes, elevations, drawing revisions, and check points before setting out transmission-tower foundations.
Read MoreEngineering tips and information
Review coordinates, axes, elevations, drawing revisions, and check points before setting out transmission-tower foundations.
Read More
Coordinate control, alignments, and elevations between the road, structure, and construction stages before bridge setting-out.
Read More
Record visible utilities, features, positions, and access notes; a surface survey alone does not locate buried services.
Read More
From survey points and breaklines to surface limits, document terrain-model inputs and check how well the result represents the site.
Read More
Learn when laser scanning’s dense point cloud may help, and how coverage, scope, and processing affect the deliverable.
Read More
Check units, coordinate reference, column order, and point codes before import, then verify a sample in the CAD drawing.
Read More
Use clear filenames, revisions, backups, and transfer logs so field measurements reach the technical office unambiguously.
Read More
Practical battery storage, charging, swapping, and field power checks, with the instrument maker’s guidance as the authority.
Read More
Measure and enter prism height correctly, then recheck it after setup changes to prevent coordinate errors.
Read MoreAl-Iman Office team is always ready to provide support and consultation for your project.