The Suez Canal governorates — Port Said, Ismailia, and Suez — are a strategic zone with major development projects in the Suez Canal Economic Zone.
EL EMAN Office serves Port Said, Ismailia, and Suez with specialized surveying and contracting services. Contact us today.
Looking for the best surveying office? Read our guide to choosing the best surveying office in Egypt: 8 criteria to compare any land surveying office before you sign.
The nature of the Canal region and its effect on survey work
The Canal cities lie beside the waterway, ports and industrial and logistics zones, which means large and varied projects that need an accurate land survey to define land and facilities. The area is surrounded by low-lying land, lakes and reclaimed zones, so attention must be paid to groundwater level and soil type before any design.
- Topographic surveys of low-lying sites to calculate fill quantities.
- Setting out axes for factories, warehouses and internal roads.
- Matching plot boundaries with allocation contracts and plans.
Industrial and logistics projects
Industrial facilities need wide ground levelling to defined levels for drainage, and precise setting out of heavy foundations and machine bases. Survey monitoring is also useful to track settlement of large structures after operation begins, if required.
Coordination with the designer is essential to fix the permanent control points used throughout the project.
Questions to ask before signing a contract
- What instruments are used, and is the work tied to known control points?
- What deliverables are provided: drawings, reports or coordinate files?
- How is the accuracy of the work checked and reviewed?
- Who bears the cost of correcting errors if they appear?
These questions protect the client and make the limits of responsibility clear early.
Following heavy construction and large facilities
In large factories and warehouses, industrial floors must be very flat for cranes and equipment, which depends on monitoring pour levels with a rotating laser or a level. An as-built survey checks that axes and levels match the drawings, an important requirement when installing machines that need precise alignment. In special cases the settlement of a structure must be monitored by periodically measuring set points and comparing the results with the limits set by the designer.
- Fix the monitoring points from the start of the project.
- Record measurements on fixed dates with comparison tables.
- Tell the designer immediately of any unexpected movement.
EL EMAN can review a project's survey needs according to its size.
Frequently asked questions
Why should I care about groundwater here?
Because a high level affects excavation depth, waterproofing and the foundation type, and may raise cost if it is not allowed for in the design.
What are permanent control points?
Fixed marks with known coordinates and level, set up on the site so the surveyor and contractor can refer to them throughout construction.
Does surveying allocated land differ from owned land?
The technique is the same, but allocated land is matched against the allocating body's conditions and plans.



